Tango Connect 2022

SPACE - Area Management

Issue link: https://resources.tangoanalytics.com/i/1487562

Contents of this Issue

Navigation

Page 12 of 22

©2022 Tango CONFIDENTIAL - Not for publication or distribution Tango | SHIFT AREA DO'S AND DON'TS 1. Shift Areas cannot be modified to be another type, and other types cannot be modified to be a Shift Area (with the exception of a Flex Area). Make sure you create it correctly. 2. Remember that Shared or Common spaces cannot be attached. 3. The Shift Multiplier is typically 2 or 3, but can be fine tuned to your requirements. 4. Shift Area colors in the Visualizer will vary floor by floor. 5. Ensure that MAC Enabled is Checked for use with MAC Requests. 6. Remember that you can manage Shift without a Shift Area. 13

Articles in this issue

view archives of Tango Connect 2022 - SPACE - Area Management