©2022 Tango
CONFIDENTIAL - Not for publication or distribution
Tango |
SHIFT AREA REQUIREMENTS
Area Requirements
• Area Type = Shift
• Is Flexible = Yes
• Is Shift = Yes
12
Space Requirements
• Charge Type = Assignable
• Wkst Type = Shift or Null
• Spaces can only be in 1 Shift Area
(but can be part of other Area
Types)
• Space cannot also be in a Flex or
Sublease Area